Byron In Exile
Frederick Fucking Chopin
- Joined
- May 3, 2002
- Posts
- 66,591
I think so, too.That calls for a youtube video.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I think so, too.That calls for a youtube video.
and greener.What does not kill us makes us stronger.
envy.You don't know what fun is until you use a torch to cut an elevator loose on the 5th floor.
It made such a bang that the cops came.
Forgive me for missing the Inedible Hulk reference.
There were only a handful of mishaps. For the most part the poison went into the big metal boxes. The buildings were stuffed full of many different mechanical systems. It was the most interesting and challenging job I have ever had. I was also very happy on the last day knowing I would never have to return.

Contractor A
Contractor B:
Contractor A
Claimed I owed him $500 out of a $1500 fee on a porch addition for which I produced Permit Drawings. I told him repeatedly that he never once mentioned anything about a commission, finder's fee, or anything. He said I was ripping him off, after all the jobs he'd sent my way (all two or three of them), none of which ever involved a kickback to the contractor.
He said he might have to come over and kick my ass, so I told him I might have to call the cops to say I was being threatened. He hung up on me.
Called back a little later, apparently realizing he'd stepped in his own shit, and said, "you must need the money more than I do, we just won't do any more business with you." Oooooh, I'm so disappointed.
Contractor A is also the pastor of a Baptist ministry.
Contractor B:
Had me do drawings for a doctor's office. The building owner was responsible for providing a one hour rated wall separating it from the next tenant. Contractor B was to build it and get reimbursed for the cost, since it wasn't part of the doctor's office project scope. He needed a drawing for the building inspector, so I charged a measly $495. His words were, "I'll get you paid."
Five months after the construction is complete, I finally get through on the phone after sending an invoice every month, leaving phone messages, and such. He, too, thinks I owe him a freebie for sending work my way (work no one ever mentioned his name in connection with), and that the $495 was too much. As if he was Mr. Big Shot (he's not even fully licensed and has to have someone else act as GC), he too said he wouldn't send me any more work.Every other word from him was "fucking." He ended with, "Fuck you," and I reciprocated.
So much skullduggery goes on. I had to quit the company that tried to make me a foreman. I couldn't handle all the shady shit I had to do.
A question for you thor, since we are on the topic of tunnels.
They are boring a new tunnel under the east river, connecting the LIRR to Grand Central Station. The tunnel entrance for construction purposes is just to the west of the train tracks. If you put this in Google Satellite:
29th street and 40th rd queens
And zoom in, then scroll down a little, you'll see the rig and the yard and the hole. On the other side of the tracks, in the SUnnyside Train Yard, they are putting the approach proper. In that photo, it's just a blank whitish area next to a white building with slitty horizontal windows and a water tower.
Anyway, first they put slurry walls in, then dug down about 50 feet, creating a huge concrete bathtub that will hold the tracks going down to the tunnel. Then they put those big steel tubes in that you can see in the other hole to hold up the walls. They let the whole thing fill up with water, which sat there for a couple of years and was dark brown as you can imagine.
Going by there today, I saw that the water is still there, but now it is clear as a swimming pool and greenish-blue as if it had been filtered and chlorinated. Why would they do that?
I can imagine the water being dark brown at first, and if it sat there for a couple of years, the sediment might have dropped out. If it was time to dewater the hole, then they might have added a flocculant to cause the suspended solids to clump up and drop out. Then, it's easier to meet clean water discharge criteria. I'm just guessing.
That must be it. WIth all the rain and shit washing in there, there's no way that natural processes cleaned the water.
The must have a bottom liner in that hole and I bet it's pretty gooey on top of it.....
I'll try to take a pic or a vid with my cam when the train goes by the hole next time. The whole thing is weird looking.
I've only worked on a couple of tunnels........and none installed like that one was.......
What's the rush?
Somewhere, there is a huge pile of B25 boxes, each tagged and filled with contaminated junk.....