What do you prefer?



You actually are dumber than a box of rocks.



Final Environmental Impact Statement:
http://www.keystonepipeline-xl.state.gov/clientsite/keystonexl.nsf?Open

U.S. Department of State Press Release:
http://www.state.gov/r/pa/prs/ps/2011/08/171084.htm

On August 26, 2011, the U.S. Department of State (the Department) issued the final Environmental Impact Statement for the proposed Keystone XL oil pipeline, which, if approved, would run from Alberta, Canada to Texas. Under Executive Order 13337, the Department is responsible for receiving all applications for presidential permits for the construction of a pipeline crossing a United States international border. After consultation with eight federal agencies and the public, the Department is charged with making a determination as to whether a permit for the Keystone XL oil pipeline is in the U.S. national interest.

About the Proposed Project

TransCanada Keystone Pipeline, LP (Keystone) filed an application in 2008 for a Presidential Permit with the Department of State to build and operate the Keystone XL Project. As shown on the map at right, the proposed Keystone XL Project consists of a 1700-mile crude oil pipeline and related facilities that would primarily be used to transport Western Canadian Sedimentary Basin crude oil from an oil supply hub in Alberta, Canada to delivery points in Oklahoma and Texas. The proposed Project would also be capable of transporting U.S. crude oil to those delivery points. The proposed project could transport up to 830,000 barrels per day and is estimated to cost $7 billion. If permitted, it would begin operation in 2013, with the actual date dependant on the necessary permits, approvals, and authorizations.

About the Process

In September 2008, TransCanada Keystone Pipeline, LP filed an application for a Presidential Permit with the Department of State to build and operate the Keystone XL Project. Executive Order 13337 directs the State Department to review applications for Presidential permits when the proposed project would cross an international border with the United States. It also directs the Secretary of State, or her designee, to consult with at least eight other federal agencies, and then issue a decision as to whether granting a permit is in the national interest.

As part of the Presidential Permit review process, the Department has prepared an Environmental Impact Statement (EIS) consistent with the National Environment Policy Act (NEPA). The issuance of a Final EIS is one step in the review process and does not represent a final decision on the permit application.

Following the release of the Final EIS, a review period begins to determine if the proposed project is in the national interest. This broader evaluation of the application extends beyond environmental impact, taking into account economic, energy security, foreign policy, and other relevant issues. During this time the Department will consult with, at least, the eight agencies identified in the Executive Order to obtain their views. The Department will also solicit public comments, both online and in public meetings in the six states the proposed project would traverse and in Washington, DC.

We are on track for the Department of State to make a determination by the end of this year. Above all else, the Department is committed to maintaining the integrity of a transparent, impartial, and rigorous process.


The Final Environmental Impact Statement

The environmental and safety review of the proposed project has taken place over the period of more than 2.5 years. To assist in preparing the EIS, the Department issued a competitive contract to an environmental consulting firm, Cardno ENTRIX. Consistent with the Council for Environmental Quality (CEQ) Guidance the final EIS includes information and analysis developed by Department staff working with its environmental contractor. Other federal agencies, independent scientists and engineers, subject matter experts, as well as tens of thousands of comments from the public helped inform the Final EIS. The resulting report is consistent with NEPA and provides information on the following: purpose and need; project design and safety; spill potential and response; potential environmental impacts of oil spills; alternatives considered; and a thorough environmental analysis.

The Department worked especially closely with the Environmental Protection Agency (EPA), the Department of Energy, and the Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA), which oversees pipeline safety. During the process, the Department consulted frequently with EPA to address the questions and requests for further information from EPA’s public comment letters. A list of EPA’s comments and the Department’s response can be found, along with the Department’s responses to all of the public comments it received, in Appendix A of the final EIS.

The Department also consulted extensively with PHMSA, who is responsible for oversight of pipeline safety. Building on passed experiences and taking into account input from experts inside and outside the government, the Department and PHMSA established 57 project-specific Special Conditions. PHMSA would have the authority to inspect and enforce the Special Conditions, which include requirements that exceed existing regulations, such as: the pipeline would be pressure tested to a higher pressure before it is placed in service, mainline valves on the pipeline would be spaced closer together, the pipeline would need to be inspected and cleaned more frequently, any internal corrosion in the pipeline would need to be repaired sooner, and the pipeline would be buried deeper. More detail on the Special Conditions is in the Executive Summary and discussed in depth in Section 3.13 and in Appendix U.
 
I'm for turning the entire US into a giant park. If you can't or just refuse to live like that, adios. Call it natural selection...

love it.

i flew over texas once lowlevel headed to oklahoma, the only thing i saw was brown bushes, brown grass, everything dried up and dead looking, and i thought, "who the fuck would want to live here?"
 
God Bless Texas Keystone and all of its owners. May your children not be touched by the anger of others.
 
McKibben and the dimbulbs have harped repeatedly about "inevitable leaks" from the Keystone XL pipeline being a danger to the Ogallala Aquifer.

This is either rank demagoguery or shocking ignorance. I suspect the former.

The land above the Ogallala Aquifer is already festooned and criss-crossed with many dozens of oil and gas pipelines.

One more will not change the risks already present, which are historically and demonstrably negligible.

Google "pipelines in the United States" and compare the resulting maps of crude oil and natural gas transmission pipelines with the maps of the location of the Ogallala Aquifer.

The dense natural gas pipeline network in western Kansas and the very large crude oil pipelines feeding the refineries in Borger, In the Texas Panhandle, were laid over the Ogallala Aquifer back in the 1940's and 1950's.

In those days the steel was poor, welds were suspect, inspection was minimal, corrosion control was rudimentary and regulation was cursory. Leaks have happened; no one denies that.

The Ogallala Aquifer is located perhaps 400 feet below the surface up in South Dakota, yet rises to no more than 100 feet below the surface at its southern end in West Texas.

Yet despite the density of pipelines in the shallowest part of the aquifer, no contamination has ever taken place.

The reason is simple enough. Leaks of crude oil, if there are any, flash off their light ends and leave their tarry "bottoms" behind, to a consistency of asphalt. To the consistency, by the way, of the bitumen from the Canadian Tar Sands. These heavy bottoms mix with the sand and rock in the pipeline trench, make a composite like road blacktop, and never leave the trench.

I challenge McKibben to identify a physical mechanism by which these mixtures of tar, sand and gravel could burrow down through 100-400 feet of rock to contaminate an aquifer under pressure.

I suspect McKibben already knows that the "aquifer contamination" issue is a red herring.

http://en.wikipedia.org/wiki/List_of_oil_pipelines

Big Inch
Calnev Pipeline
Colonial Pipeline
DixiePipeline
Enbridge Pipeline (Toledo) Inc
Keystone Pipeline
Lakehead Pipeline
Minnesota Pipeline
North Dakota System
Portland-Montreal Pipe Line
Trans-Alaska Pipeline System
Trans Mountain Pipeline
Unev Pipeline
Yellowstone Pipeline
 
Back
Top